Update Audit Finding
Finding ID:
103
Finding Location:
Finding:
Secondary chemical container not properly labeled
Finding Category:
-- Select Finding Category --
Compressed Gas Cylinders
Control of Hazardous Energy (Lockout Tagout)
Electrical Safety
Emergency Egress
Emergency Planning
Ergonomics
Fall Protection
Fire Protection
General Work Environment and Housekeeping
Hand and Portable Powered Tools and Equipment
Hazard Communications and Chemicals
Heat-Related Illness Prevention
Infection Control
Machinery and Machine Guarding
Material Handling
Material Storage
Noise Exposure
Overhead Cranes
Personal Protective Equipment
Portable Ladders
Powered Industrial Trucks
Record Keeping
Respiratory Protection
Robots
Safety and Health Policies
Security
Stairs and Stairways
Walkways
Welding and Soldering
Other
Criticality:
-- Select Criticality --
Critical
High
Medium
Low
Proposed Action:
Implement control via Fastenal cabinet in point of use sizes.
Assigned To:
Assigned to Email:
Containment Due Date:
Containment Action Taken:
Plan to review floor and label.
Corrective Action Due:
Updates:
4/28/25 - Bill investigating control of bulk containers, update coming next month. 6.30.2025. Jim B., per Bill's request Fastenal will stock the secondary containers. Associates requiring containers will need to contact a supervisor or group lead. The appropriate labels will be placed on the bottles, prior to distribution from the vendor cabinet. Implementation date TBD. 7/28/25 - moving bottles to Fastenal cabinet. Bill to make another sweep on the Floor. Label meeting to be held between Jim, Bill, and David.
Corrective Action Taken:
Moved to Franklin issues
Completion Date:
Corrective Action Pictures (Max 5 MB each, up to 5 images):
Control Method:
-- Select Control Method --
Eliminated
Substituted
Engineered
Administrative
PPE
No New Control
Status:
Not Assigned
Open
Ready for Review
Update Record
Finding Images: