| 245 | BG-A | 2025-10-28 | North Docks | Powered vehicle repair associates leave oil from repair on floor from repairs. | Medium | | 2025-12-16 | Not Assign |
| 229 | BG-W | 2025-09-24 | BGW | Small Parcel packaging area. Eliminate all the daisy chains from the power extensions. | Medium | Validated. | 2025-11-12 | Ready for |
| 237 | Franklin DVAF | 2025-10-23 | medium voltage test | Access to shepherds hooks are blocked | Critical | Shepherd's hooks relocated to readily accessible locations. | 2025-11-07 | Open |
| 238 | Franklin DVAF | 2025-10-23 | medium voltage test | Fire blanket stored too high for emergency access | Critical | Fire Blankets relocated to accessible locations | 2025-11-30 | Ready for |
| 218 | Franklin DVAF | 2025-08-28 | packaging | Use retractable air hose to prevent trip hazard | Medium | Hose real has been installed. | 2025-10-30 | Open |