Audit Findings: Open Status with Completion Date and/or Action Taken

Finding ID Facility Audit Date Finding Location Finding Criticality Action Taken Completion Date Status
240BG-A2025-10-28CompactorsNo defined walkway to bring large carts/ pallets to access compactors. Creates safety hazards. High2026-01-07Not Assign
308BG-N2026-04-29DMD VAU TestThe visual light indicator that identifies when the VAU test equipment is operating is not plugged in. MediumConnect and test the indicator stack Light.

The stack light was tested by running an ATE program and observing the light conditions; all three lights were functioning properly.
2026-06-09Open
296BG-N2026-03-24BGN WarehousePallet is overhanging the rack. Exceeds allowed distanceHighRelocated pallet from AA05-51 to Z14-51 2026-03-30Not Assign
326BG-R2026-06-12BGR cleanroomSurge protector strips used with extension cords.MediumPurchased GFCI power strips to fix issues2026-07-30Ready for
299BG-R2026-04-10Bench RepairLive power greater than 50 V that is not protected by barriers or PPE requirements. No evidence of arc/study being done.. NFPA 70CriticalRetractable barriers surround testing units to prevent unauthorized access. Those present in the area wear the necessary personal protective equipment.2026-07-23Ready for
300BG-R2026-04-10Paint BoothAssociate wearing personal cannister respirator with no evidence of medical evaluation or fit test. The process does not require use of a respirator but, for personal reasons, the associate feels more comfortable when wearing a respirator.Highno further action necessary.2026-04-10Not Assign
301BG-R2026-04-10WarehouseSkids stacked higher than 6 ftMediumReiteration of 6 ft pallet stacking heights in the warehouse made to the team. No pallets are to be stored 6 ft or higher. If so, they must be banded.
Continual monitoring.
2026-05-29Open
229BG-W2025-09-24BGWSmall Parcel packaging area. Eliminate all the daisy chains from the power extensions.MediumValidated. 2025-11-12Ready for
298FR12026-03-26LV TestSystem E-Stops are outside theater barricade. Adding new test fixtures increase distance to system E-Stops. Recommend adding EPOs (Zone emergency power offs) to column on south side of floor mount and two inside the test area (most likely people to first recognize the emergency are the testers inside of the theater barricade.)Medium2026-06-01Not Assign
249FR12025-12-18All linesflammable boxes sitting on skids need to be moved to the ground for groundingMedium2026-06-05Open