| Finding ID | Facility | Audit Date | Finding Location | Finding | Criticality | Action Taken | Completion Date | Status |
|---|---|---|---|---|---|---|---|---|
| 364 | BG-A | 2026-09-24 | DS4 | Defibrillator needs to be accessible for use. | Critical | This was a test....no action required. | 2026-10-13 | Not Assign |
| 308 | BG-N | 2026-04-29 | DMD VAU Test | The visual light indicator that identifies when the VAU test equipment is operating is not plugged in. | Medium | Connect and test the indicator stack Light. The stack light was tested by running an ATE program and observing the light conditions; all three lights were functioning properly. | 2026-06-09 | Open |
| 296 | BG-N | 2026-03-24 | BGN Warehouse | Pallet is overhanging the rack. Exceeds allowed distance | High | Relocated pallet from AA05-51 to Z14-51 | 2026-03-30 | Not Assign |
| 326 | BG-R | 2026-06-12 | BGR cleanroom | Surge protector strips used with extension cords. | Medium | Purchased GFCI power strips to fix issues | 2026-07-30 | Ready for |
| 299 | BG-R | 2026-04-10 | Bench Repair | Live power greater than 50 V that is not protected by barriers or PPE requirements. No evidence of arc/study being done.. NFPA 70 | Critical | Retractable barriers surround testing units to prevent unauthorized access. Those present in the area wear the necessary personal protective equipment. | 2026-07-23 | Ready for |
| 300 | BG-R | 2026-04-10 | Paint Booth | Associate wearing personal cannister respirator with no evidence of medical evaluation or fit test. The process does not require use of a respirator but, for personal reasons, the associate feels more comfortable when wearing a respirator. | High | no further action necessary. | 2026-04-10 | Not Assign |
| 301 | BG-R | 2026-04-10 | Warehouse | Skids stacked higher than 6 ft | Medium | Reiteration of 6 ft pallet stacking heights in the warehouse made to the team. No pallets are to be stored 6 ft or higher. If so, they must be banded. Continual monitoring. | 2026-05-29 | Open |
| 367 | BG-W | 2026-10-07 | Production Floor | The crane slings used to lift gearhead motors need to be shortened to ensure safe lifting and handling of the equipment. | Critical | Two legged sling with shorter legs was deployed to the line so that extra legs can't snag onto any carts | 2026-10-19 | Open |
| 347 | FR1 | 2026-08-27 | Packaging/Warehouse | Damaged skid loaded on rack. Create a library of accessibility criteria for skid condition and stacking. | High | 2026-09-28 | Open | |
| 350 | FR1 | 2026-08-27 | harness cell | Need to add holders or holsters at workstations for heat guns | High | Install holder. | Open | |
| 333 | FR1 | 2026-06-26 | MV loading bay | water on floor from truck that was loaded one hour earlier than the audit the people loading the truck did not verify that the water was that the area was dry. Water puddles were left the whole length of the truck on the floor. | Medium | Warehouse team responsible to clean up water once trucks depart. | Not Assign | |
| 319 | FR1 | 2026-05-28 | Flr Mnt and MV Production | Crane inspectors are not using the checklist when completing the crane inspection. They are relying on their memory then going to a computer to enter the results. In both observations (1 in Flr mnt and 1 in MV) the inspector missed at least one step. The crane operator at the FM crane had not looked to see that the crane had been inspected prior to using it. The manual inspection slide had not been updated to show the crane had been inspected that day. The crane inspection app did show the inspection was completed. The supervisor said the operators can use either method. The entire crane inspection process needs to be reviewed. Checklists must be used during the inspection and supervisors must ensure the process is being trained and followed. | Critical | Deploy iPads so inspections can occur at equipment. | 2026-11-11 | Not Assign |
| 304 | FR1 | 2026-04-23 | MV Dock and Old Dock Area | Bollards don't effectively protect the crane columns on the north side of the entrance to the old dock area. | Medium | Floor patched and add floor tape. | Open |