Inspection Point |
Details |
Result (Yes/No/N/A) |
Comment (Optional) |
Upload Image (Optional) |
Operational Controls |
Observe the operator to ensure they understand and use all crane controls properly. |
|
|
|
Load Rigging |
Verify that the load is rigged correctly and securely, with no slippage or imbalance. |
|
|
|
Load Capacity |
Ensure that the load being lifted does not exceed the capacity of the crane, hoist, or rigging. |
|
|
|
Load Stability |
Confirm that the load is stable and properly balanced before lifting. |
|
|
|
Trolley and Bridge |
Observe the crane trolley and bridge travel; it should move smoothly with no unexpected stops, jerks, or excessive noise. |
|
|
|
Hoist Operation |
Ensure smooth and controlled raising and lowering of the load, with no sudden movements or uncontrolled descent. |
|
|
|
Use of Limit Switches |
Confirm that limit switches are functioning properly and are being used to prevent over-travel of the hoist. |
|
|
|
Load Path |
Observe the load's path of travel to ensure the load is never above any part of a person, vehicle, or other equipment. |
|
|
|
Load Lift |
Confirm that the load is lifted gradually and smoothly without sudden movements. |
|
|
|
Load Swing |
Ensure that the load does not swing excessively during operation and is controlled at all times. |
|
|
|
Load Placement |
Verify that the load is lowered and placed gently in the correct location, ensuring that no damaged is caused. |
|
|
|
Load Security |
Ensure that any slings, hooks, or rigging gear are disengaged from the load safely and securely after placement. |
|
|
|
Crane Travel |
Check that the crane does not travel with a load more than necessary, and when it does travel, it is done slowly and with care. |
|
|
|