Facility: FR1 | Work Area: O&G Assembly | Station: Panel Integration
Work on new design to fit the new design of the Weatherford Product line and make Process safer for the Employees.
Design will be completed and then Work Instruction will be written, Trained and Deployed.
| Energy / Category | Hazard Description | Risk Level | Mandatory Control Measures |
|---|---|---|---|
| Struck-by, Struck-against | Pinch point and Fall Hazard |
Score: 4 Low |
Engineering Control
|
Not Applicable
| Chemical Name | Secondary Container | SDS on File | SDS Sheet |
|---|---|---|---|
| None | No | No | None |
| Tool / Equipment | Inspection & Maintenance Protocol |
|---|---|
| Tilt Install Tool | Redesign needed to reduce Risks of Pinching and Falling during normal operation. |