Facility: FR1 | Work Area: Floor Mount | Station: Panel Prep and Assembly
select appropriate rigging, attach rigging, left about 2 inches to make sure lot is secure, move load to conveyor, lower load, and remove rigging from component
| Energy / Category | Hazard Description | Risk Level | Mandatory Control Measures |
|---|---|---|---|
| Struck-by, Struck-against | improperly secured load could fall |
Score: 10 Low |
0
|
Must be qualified crane and hoist operator
per station checklist
For associares working in higher risk areas
| Tool / Equipment | Inspection & Maintenance Protocol |
|---|---|
| crane and hoist | inspected start of each shift |
| Drill Press | Daily visual |
| Powered torque tools | Daily visual |