Job Hazard Analysis (JHA) #30
Print / PDF
Master Assessments
JHA Header Information
Hazard Analysis ID
Facility
Assessed By
Assessment Date
Work Area
Station
Process
Placing Panel Assembly into the Enclosure of the Weatherford designed enclosures. Panel is Assembled on a 1,000# Cap Pump Cart with Engineered modification (Christian Johnson) from 2019 (or earlier). The design was to allow the Pump Cart to be an Assembly aide to assist the Associates in tilting the Panel into the Enclosure without manual lifting as was done in Weatherford before it moved to YAI. The original Process was to manually lift the unit into the Enclosure, it was changed to interim design to use a small Crane assist in the lift until Christian designed the assist Tool. Current design with the GEM Series has created an additional "Pan" around the drive which creates an issue with how the unit can be manipulated into position. The process used with the 2X4 runners on the side of the Panel create an issue where the weight of the unit causes the Panel to "dig" into the runners and STOP the unit from sliding into the Enclosure. A redesign is needed to accommodate the size changes from the beginning of the project.
Identified Hazards & Required Controls (Most Critical First)[cite: 7]
No tasks recorded for this JHA.
Station Details
Competencies
Tools
Chemicals
Job Tasks and Hazards
Required PPE
Ergonomic Risk Assessment
Station Details
Station Controls
Signs
Barriers
Other Controls
Environmental Factors
Temperature (°F)
Noise (dB)
Dust
Vapors / Mists
Poor Lighting
Work Alone
Workstation Images
Add Workstation Images
Save Changes
Required Competencies
Save Competencies
Tools Used
Save Tools
Chemicals Used
Save Chemicals
Job Tasks and Hazards
Add New Task
Save Tasks and Hazards
Required PPE
Eye Protection
Safety Glasses w/ Shields
Vented Goggles
Non-Vented Goggles
Welding Helmet/Shield
Laser Protection
UV Protection
Face Shield
Head Protection
Type 2 Class G
Bump Cap
Hearing Protection
Hearing Protection
Respiratory Protection
Filtered Face Mask
Half-Face P100
Organic Vapor
Foot Protection
Toe Protection
Electrical Hazard
ESD
Metatarsal
Puncture Resistant
Chemical Resistant
Electrical Protection
Class 0 Gloves
Class 1 Gloves
Class 2 Gloves
CAT 1 Arc
CAT 2 Arc
CAT 3 Arc
CAT 4 Arc
Natural Fiber
Arc-Rated Clothes
Save PPE
Ergonomic Assessment
Wrists
Postures
Force
Duration
Frequency
Left Wrist
Extended
Pinch ≥ 2lb | Power ≥ 10lb
≥ 10 sec
≥ 30/min
Flexed
Radial Dev.
Ulnar Dev.
Right Wrist
Extended
Pinch ≥ 2lb | Power ≥ 10lb
≥ 10 sec
≥ 30/min
Flexed
Radial Dev.
Ulnar Dev.
Ergonomic Stressors
Vibration
Low Temp
Compression
Impact
Time on Task per Week
Select an option
> 40 hours
20-40 hours
4-19 hours
≤ 4 hours
Save Ergonomics